about
 

Side table -lacquer finish-

 title="null"alt="null"

 title="null"alt="null"

 title="null"alt="null"

Product : Side table for residential project
Finish: copper table top with traditional lacquer finish
             dyed wood legs
Size: low: W1300_D600_H360 / high: W700_D400_H580
Design : MILINARIC, HENRY & ZERVUDACHI LTD.


-----------------------------------------
Metalwork -display table & wall finish-

Project: Takadai house / wall finish
Technique: black stained copper plate with clear matte finish
Delivery time: approx. 3 months (for production only)
Size: W1900 x L850 x D0.8mm
Design: KIDOSAKI ARCHITECTS STUDIO

 alt=""title=""

 alt=""title=""

 alt=""title=""


This copper wall serves as the best background for art pieces
also playing a role of adding the authentic image to the space.
This indeed is a piece of art itself. We also produced display tables,
made in ebony and oak.

About the copper sheet for the wall, due to the limit of the facility,
it normally comes in 600mm x 600mm.
The especially-arranged "0.8mm thick 1000mm x 2000mm sheet"
took a few craftsmen on the production.

The timing is the key, since the colors can be varied depending on
the humidity and temperature. High skill and adequate is neccesary
in order to control the slight difference in the result.


-----------------------------------------

Metalwork -tree objet-

 title=""alt=""

Project: Peninsula Hotel Tokyo / Tree object
Technique: aluminum plated in mirror finish & urethane coating
Delivery: approx. three months (for production only)
Size: H2700 for 4 trees / H2400 for 3 trees
Design: SSD

 title=""alt=""
The tree objects are installed at the bar located at
top floor in Peninsula Hotel Tokyo.
The project began with the concept and image of
tree reflecting like a mirror. These are made by full
aluminum pieces with the plate finish done in vacuo
and it is reflecting the surrounding like a mirror servinging
to create impressive atmosphere.
*The leaves are especially arranged at SSD using
  their original reflective material.

Production Flow
Aluminum pieces being casted.
 title=""alt=""

Pieces are removed from the mold.
 title=""alt=""

Branches being preset to form the tree.
 title="null"alt="null"

Surface being polished.
 title="null"alt="null"

Assembling after coated.
 title=""alt=""

Installed
 title=""alt=""



-----------------------------------------

Metalwork -lounge table-

 title="null"alt="null"

Project: Ginza Lounge / Lounge table
Technique: cast aluminum with baked paint (table top: glass)
Delivery: 6 weeks
Size: W450 x L450 x H580
Design: Kenichi Otani

We suggested the cast aluminum technique to create
interesting formed legs and also to give enough weight
as well as stability to the table.
The glass table top is fixed to the leg with UV glue.


-----------------------------------------



Metalwork -plumbing fixture-

 title="null"alt="null"

Project: plumbing fixture for residence
Finish: sulfide
Delivery: 2 weeks
Size: W450 x L450 x H580
Design: KIDOSAKI ARCHITECTS STUDIO

They are plumbing fixtures customized for
a residential project in Kamakura.
It started with the question by the architect whether
the original finish can be applied to the ready-made fixtures.
We suggested traditional coloring for the metal for parts
such as faucet, piping, towel rack, etc. which are normally done
with chrome plating.
Applying customized finish to the plumbing fixtures was unique and
interesting, adding clean-old impression to the space.


-----------------------------------------



Metalwork -brass lamp-

 title="null"alt="null"

 title="null"alt="null" 

Project: Hotel Claska / brass lamp
Technique: Raw casting
Finish: brushed finish using a potter's wheel
Delivery: 4 weeks
Size: 150 dia.×h1250 mm
Design: Intentionallies
Price: JPY 210,000 *not available for sale

The floor lamp used at the lobby of "Hotel Claska"
in Meguro, Tokyo is made of brass. The same mold
is also used to produce pendant lightings and 
bracket lightings. 
Craftsmen were confused at first, to ship their products
without the  final coloring. It was a great challenge for
the craftsmen, utilizing techniques to make Buddhist altar
fittings to lamp in high-end  hotel.
We discussed about the risk of small pinholes,
but we were sure about their quality and that we would
not have any problems.


-----------------------------------------



Metalwork -tin chandelier-

 title="null"alt="null"

 title="null"alt="null"

Project: Hotel Claska / Tin chandelier
Finish: wire foil finish
Delivery: approx. 4 weeks
Design: Intentionallies

This chandelier is formed in dram shape using 100 % tin
so that the color does not change with time.
The flexibility of tin material is important character
to form this shape.

-----------------------------------------